Ameresco has finalized the construction of multiple battery energy storage systems (BESS) in collaboration with United Power, an electric cooperative serving Colorado’s northern Front Range. The project includes eight BESS arrays, providing 78.3MW (313.34MWh) of battery storage capacity to the United Power electric distribution system across various locations. Five of these sites are now operational,
To continue reading this article, please subscribe:
Monthly PlanPrice: $30 / month Features:
|
Annual PlanPrice: $300 / year (Save 17%) Features:
|
Already a subscriber? Log in here: