NKT and BritNed have successfully repaired the 1GW BritNed interconnector, restoring its operations after a power outage. The repair, carried out on the 450 kV high-voltage DC power cable, was completed with minimal downtime, ensuring the continued flow of sustainable energy between Great Britain and the Netherlands. The fault, which was localized onshore in the
To continue reading this article, please subscribe:
Monthly PlanPrice: $30 / month Features:
|
Annual PlanPrice: $300 / year (Save 17%) Features:
|
Already a subscriber? Log in here: