ABL Completes Marine Engineering Scope for 640MW Yunlin Offshore Wind Project in Taiwan

Credit: ABL

Marine engineering consultancy has successfully completed its scope of work for the monopile foundation installation campaign of the 640MW wind project, located in the Strait.

The company supported the transportation and installation (T&I) of monopile foundations for Yunneng Wind Power, a consortium involving , TotalEnergies, Electricity Generating Public Company (EGCO Group), and Sojitz Corporation.

Awarded in 2022, ABL Germany, based in Hamburg, handled a range of detailed engineering studies. These included transportation and motions analyses, seafastening equipment design, dynamic mooring analyses, tow manual development, and rigging/lift plan design verification. Additionally, ABL provided technical due diligence for T&I procedures and desktop marine assurance services.

The Yunlin offshore wind farm is situated 8 to 17 km off Taiwan's west coast, at depths ranging from 7 to 35 meters. It comprises 80 wind turbines, each with a capacity of 8 MW.

ABL has contributed its expertise to over 230 offshore wind arrays globally, with a total capacity exceeding 118GW.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use