Close Menu
  • Home
  • News
    • Solar
    • Wind Energy
    • Bioenergy
    • Geothermal
    • Grid
    • Hydrogen
    • Hydropower
    • Ocean Energy
    • Politics
  • Climate
  • Energy Storage
  • Finance
  • Opinions
  • Peoples
  • Smart Energy
  • Transportation
  • Study
  • —
  • Account
  • Log In
Facebook X (Twitter) Instagram
  • About Us
  • Advertising
  • Privacy Policy
  • Contact
Facebook X (Twitter) LinkedIn WhatsApp
Account Sunday, October 5
Energymagz
SUBSCRIBE Login
  • Home
  • News
    • Solar
    • Wind Energy
    • Hydropower
    • Hydrogen
    • Geothermal
    • Bioenergy
    • Ocean Energy
  • Region
    • Europe
    • North America
    • Asia
    • Africa
    • Middle East
    • Australia & Oceania
    • Latin America
  • Politics
  • Finance
  • Energy Storage
  • Grid
  • Climate
  • Peoples
  • Study
Energymagz
  • Wind Energy
  • Solar
  • Bioenergy
  • Geothermal
  • Hydropower
  • Ocean Energy
  • Hydrogen
  • Transportation
  • Smart Energy
Home » News » Grid » NKT Completes Cable Replacement on Dutch Section of NorNed Interconnector
Grid

NKT Completes Cable Replacement on Dutch Section of NorNed Interconnector

By Thomas KnightJuly 7, 20252 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
Credit:NKT
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link

Danish cable manufacturer NKT has completed cable replacement work on the Dutch side of the NorNed interconnector, a high-voltage direct current (HVDC) link between Norway and the Netherlands, the company said on Monday.

The NorNed interconnector, which has been in operation since 2008, facilitates the exchange of hydropower from Norway and wind power from the Netherlands, supporting the energy transition and improving transmission reliability across Europe. The recent work was part of a planned replacement programme by Dutch transmission system operator TenneT to maintain system stability.

“We are delighted to support TenneT in maintaining the reliability of the NorNed interconnector,” said Axel Barnekow, NKT’s Executive Vice President for Service and Installation. “Our expertise in delivering high-quality cable solutions ensures that the transmission system remains robust and efficient.”

The project, which began in early April and concluded in early June, involved the delivery of 450kV onshore high-voltage cables in Eemshaven, the Netherlands. NKT also manufactured and installed new terminations and refurbished existing ones, which TenneT will retain for future use.

Some sections of the cable will be kept as spare parts under the terms of an existing service agreement between NKT and TenneT.

Spanning 580 kilometres from Feda in Norway to Eemshaven, the NorNed link is jointly owned by TenneT and Norway’s Statnett. It has a transmission capacity of up to 700 megawatts and plays a key role in the cross-border exchange of renewable energy.

Netherlands Onshore Wind
Follow on Flipboard Follow on X (Twitter) Follow on LinkedIn
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePolice Investigate Copper Cable Thefts at Two Aberdeenshire Wind Farms
Next Article Nordex Secures 91MW Wind Turbine Order from SAB WindTeam in Germany

Related Posts

Ofgem Launches Consultation on “Beyond 2030” Grid Investment Projects

August 5, 2024 Grid

Europe’s Wind Industry Thrives, Contributing €57 Billion to GDP in 2023

June 22, 2024 Wind Energy

RWE and Smart Wires Collaborate on Offshore Wind Grid Enhancement

February 20, 2024 Grid

Petrofac and Hitachi Energy Secure Second Offshore Wind Connection Project in TenneT’s 2GW Program

January 2, 2024 Wind Energy

TenneT Unveils Ambitious Investment Plan for Grid Infrastructure Over the Next Decade

November 3, 2023 Grid

TenneT Awards €5.5 Billion Contract for HVDC Cable Systems for Offshore Grid Projects

May 5, 2023 Wind Energy
Latest Post

Peterson Energy Logistics Expands Offshore Capabilities with New IJmuiden Base

October 3, 2025

Taihan Breaks Ground on New Submarine Cable Plant in South Korea

October 3, 2025

RWE Gains Approval for 60MW Alwen Forest Wind Farm in North Wales

October 3, 2025

Greenvolt Power Wins 499MWh Contract in Italy’s First Large-Scale Battery Storage Auction

October 3, 2025

Jones Bros Completes First Turbine Foundation at 308MW Sanquhar 2 Wind Farm

October 3, 2025
Facebook X (Twitter) LinkedIn WhatsApp

News

  • Wind Energy
  • Solar Energy
  • Hydropower
  • Hydrogen
  • Geothermal
  • Bioenergy
  • Ocean Energy

Region

  • Europe
  • North America
  • Asia
  • Africa
  • Middle East
  • Australia and Oceania
  • Latin America

Friends

  • EVMagz
  • Pivle
  • SpaceMagz
  • Teknowire
  • Smashresume
  • Smashfreakz

EnergyMagz

  • About Us
  • Advertising
  • Privacy Policy
  • Cookie Policy
  • Contact

Subscribe to Updates

Subscribe for the latest in renewable energy from Energymagz.

© 2025 EnergyMagz. Designed by EnergyMagz.

Type above and press Enter to search. Press Esc to cancel.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?