Engie, EDF Renewables-KOWEPO, and Jinko Power-Jera Compete for 1.5-GW Solar Project in Abu Dhabi

Credit: Engie

French utility , a consortium of and Western Power (KOWEPO), and an alliance between Jinko Power and Jera are competing to develop the 1.5-GW Khazna solar PV project in Abu Dhabi's Al Khazna area.

These entities have submitted their bids to the Emirates Water and Electricity Company (EWEC), which will evaluate the proposals based on technical and commercial criteria.

The winning bid is expected to be announced by Q2 2025, with a subsequent (PPA) signed with EWEC.

The Khazna project will generate enough power to supply approximately 160,000 homes in the UAE, bringing EWEC's total solar capacity to around 5.5 GW.

This initiative supports Abu Dhabi's goal to achieve 13 GW in solar capacity by 2030 and to supply 60% of its energy from renewable sources by 2035.

Earlier this year, EWEC awarded the 1.5-GW solar PV project to a consortium including EDF Renewables, KOWEPO, and Masdar.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use