Nhoa Energy Begins Installation of 50-MWh Battery Storage System in Italy

Credit: NHOA Energy

, the energy storage division of Nhoa Group, has commenced the installation of a 50-MWh energy storage system (BESS) in for independent power producer ERG SpA.

The facility will be integrated with ERG's Vicari wind park, located in the southern province of Palermo. Nhoa Energy will serve as the construction contractor and will also be responsible for the operation and maintenance of the BESS under a five-year agreement.

The battery storage system will be situated in the commune of Vicari on the island of . It is designed to enhance the efficiency of the existing wind farm and will be equipped with Nhoa Energy's technology, adhering to the grid regulation standards set by Italy's transmission system operator, Terna.

Under the Fit-for-55 EU framework, Italy has set a target of 71 GWh of new grid-scale battery storage by 2030. In October of the previous year, Nhoa Energy was selected in Italy's 2024 Capacity Market auction to install a 39-MWh battery at an existing combined cycle gas plant in central Italy.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use