Enel Green Power to Invest EUR 11.5 Million in Solar-Storage Project in Canary Islands

Credit: Unsplash/APPA

Espana, the renewables arm of Spanish utility Endesa SA (BME:ELE), has announced plans to invest approximately EUR 11.5 million (USD 12.5m) in a -plus-storage project in the .

The project, which includes the 9.3-MW El Matorral solar farm and a 10.37 MWh , received a EUR 5.69 million subsidy from the EU's Next Generation funds, provided through the Institute for the Diversification and Saving of Energy, an implementing agency of the Spanish Ministry for the Ecological Transition.

Located on unoccupied land at Endesa's Barranco de Tirajana thermal power plant on Gran Canaria island, El Matorral will feature 15,000 modules covering approximately 8 hectares (19.8 acres). Endesa anticipates the solar farm to be operational by early 2026.

The project is currently in the permitting phase and, once completed, El Matorral will become the largest solar power plant with battery storage in the Canary Islands.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use