Envision Energy said on Monday its next-generation two-bladed onshore wind turbine has completed more than 500 days of field operation with a 99.3% availability rate, marking a milestone for the company’s modular wind power technology. The prototype, built on Envision’s Model X platform, was tested at the firm’s smart wind power verification centre and achieved
To continue reading this article, please subscribe:
Monthly PlanPrice: $30 / month Features:
|
Annual PlanPrice: $300 / year (Save 17%) Features:
|
Already a subscriber? Log in here: