CDWE has successfully installed the HL3 Offshore Substation (OSS) topside on the jacket structure for the 1GW Hai Long offshore wind project, located off the coast of Taiwan. This marks the completion of two offshore substations as part of the ongoing installation campaign for the wind farm, which began last year. The installation was carried
To continue reading this article, please subscribe:
Monthly PlanPrice: $30 / month Features:
|
Annual PlanPrice: $300 / year (Save 17%) Features:
|
Already a subscriber? Log in here: