NKT and BritNed have successfully repaired the 1GW BritNed interconnector, restoring its operations after a power outage. The repair, carried out on the 450 kV high-voltage DC power cable, was completed with minimal downtime, ensuring the continued flow of sustainable energy between Great Britain and the Netherlands. The fault, which was localized onshore in the

To continue reading this article, please subscribe:

Monthly Plan

Price: $30 / month

Features:

  • Full access to all renewable energy news and analysis
  • Exclusive expert interviews and industry reports
  • Daily newsletter with latest updates
  • Access to multimedia content (videos, podcasts)
  • Commenting and community engagement

Annual Plan

Price: $300 / year (Save 17%)

Features:

  • Everything in the Monthly Plan
  • 2 months free compared to monthly subscription
  • Priority access to special reports and webinars
  • Early access to newsletters and featured articles
  • Exclusive members-only content and events

Already a subscriber? Log in here:

Share.
Exit mobile version