NKT has commenced the installation of 518 km of high-voltage direct current (HVDC) power cables for the SuedLink project in Germany, on behalf of transmission system operator (TSO) TenneT. The 525 kV HVDC cables are a critical part of Germany's Energiewende strategy, facilitating the transmission of renewable energy from the northern regions, where it is
To continue reading this article, please subscribe:
Monthly PlanPrice: $30 / month Features:
|
Annual PlanPrice: $300 / year (Save 17%) Features:
|
Already a subscriber? Log in here: