Renexia and Mingyang Sign FEED Contract for 2800MW Med Wind Project in Italy

Credit: MingYang Smart Energy

and Mingyang have signed a front-end engineering design (FEED) contract for the 2800MW project off the coast of .

The agreement represents a significant step forward in the development of the farm, located 80km from the Sicilian shoreline, which will feature Mingyang's 18.8MW turbines (MySE 18-292).

Mingyang stated that integrated load analysis for the turbines has already commenced, and a prototype is successfully operational.

The collaboration builds on a strategic partnership aimed at establishing a manufacturing facility in to produce cutting-edge wind turbines, further strengthening the synergy between the two companies.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use