Schletter Group to Supply Mounting Systems for 80-MW Solar Project in Germany

Credit: EnBW

Schletter Group, a leading German manufacturer of mounting solutions, has secured a contract to supply its FS Duo mounting system for the 80-MWp Langenenslingen solar project in , southwest .

The announcement was made by Schletter Group CEO Florian Roos, highlighting the selection of their robust, twin-post system designed to endure 30 years of service.

“The FS Duo system, with its high-strength steel construction and rammed, galvanized steel foundations, ensures both swift installation and ease of removal at the end of its lifecycle,” stated Roos.

Currently under construction, the Langenenslingen solar farm is scheduled to be -connected by mid-2025. German firm Conecon serves as the project's planner and general contractor. Energie Baden-Wuerttemberg AG, which has previously utilized Schletter's solutions in other projects, will operate the solar farm upon completion.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use